I’m sorry that I’m publishing this late, but here are the notes for the retrospective we did for the 25.05 release.
-
hexa: Infrastructure Interaction fine
-
leona + hexa: Documentation improvements
Discussion about timing and collaboration
-
leona: Release Manager selction process should starting earlier to have more time for changes to the release process
-
hexa: Release Management should be a Team and not a Single person story
- +1 from leona
- 0x4A6F: team of 3 (trainee/lead/outgoing)
(leona: I agree with the proposal of 0x4A64. I’ll discuss this with the 25.11 RM and then see how we want to proceed)
Tag Situation
- leona: Tag Name situation was confusing. The release-wiki says to use
branch-off-25.05
for the tag at final release. I did it the old way. Will reopen the issue / push for discussion
Branch-Off
-
Grimmauld: Situation that all breaking changes were restricted and no breaking changes were possible for a few weeks was annoying
-
leona: One solution would be do branch-off together with breaking changes restriction. We would need more Hydra capacity for that one tho. Also risk for more changes not being backported
-
Grimmauld: Using staging as unrestricted would be an idea
-
leona: This wouldn’t work as there is a branch missing for the staging runs until branch-off
-
leona: A new change was this time that we created the staging-25.05 channel with staging unrestriction already
- good change
- matrix discussion about this: You're invited to talk on Matrix
- potential problem: 25.11 release notes files in 25.05 release branch
- Think about removing them (and move items in that because 25.05 is the first release with it) or at least not having them in the index